Chapter 224 Ye Yan's Cry(4/8)
The
Power plant
�
�
But it can no longer meet the current industrial and agricultural students in Donghua
Production Institute
need
�
�
�
The birth of the revision in 1993
Port Power Plant
Expansion plan
�
I want to increase the installed capacity of two units with a capacity of 350,000 kilowatts.
�Strength generator set
�
Unfortunately, the expansion office
need
Nearly ten
100 million funds
�
There is no
Fall
�
�
Meigang's electric power
�电影
Production line is
�The big telecommunications agent
�
�It cannot solve the power supply problem�
�
�Mei Steel cannot break out
Break the bottleneck of development
�
�
Currently, the profits of steel are extremely high
High
�
� Institute
Yimei Steel can use high-cost generator sets
Replenish the power space
��
�
But it's not a long-term solution
�
�Built power plant
It is inevitable
�Choose
�
�
Meigang is seriously tight in funds
In the case
�
� Need
�
Choose the best
Combined
�
The
Road
�
�Built power plant
One
Expect
The scale is naturally large
�
�
Chen Huai's most
The first plan is one
Expect
Equipped with two generator sets with an installed capacity of 6,000 kW
�
�It can almost reach birth
Port Power Plant
Building a factory
The scale of
�
�
one
It is a self-built power plant in Meigang
�
�
�2nd Power Plant
Scale
�Small
�
To be continued...